Specifications Double chamber incinerator
Primary combustion
Diesel/LPG/LNG burning primary combustion chamber/primary combustion zone
Secondary combustion
Residence time in the secondary chamber not less than 2 seconds
Both primary and the secondary temperatures maintained until all the waste has been completely combusted
Chimney
Diesel/LPG/LNG burning primary combustion chamber/primary combustion zone
Secondary combustion
Residence time in the secondary chamber not less than 2 seconds
Both primary and the secondary temperatures maintained until all the waste has been completely combusted
Chimney

Chimney with a minimum height of 4 meters above ground level
Minimum exit velocity of the emissions not less than 10 metres/second
Temperature Warnings
Audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature
General
Control box that can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter height
Recent Posts
- biohazard waste disposal guidelines
- Clinical waste incineration and hazardous waste incineration facility
- Animal Cremation Incinerator Model A600
- ES Fiber Production Line and 400mm Melt blown Production Line and 1600mm Melt blown Production Line and and N95 Mask Machine and Disposable Mask Machine
- N95 Face Mask Machine Production Line on Sale Now! $250,000USD per set
Please fill all widget settings!

